5 DEC 2011

Hi all,

Well the frames are all up and it looks like a house and now it is time for me to start cladding it and finishing. Sam has done a great job and saved us a heap of time. Most of this Owner building thing is knowing when to pay someone and when to do it yourself. It was definitely worth paying Sam to get us to this stage he put 10,000 screws in just the sub floor steel. Today Callum and I measured up the roof for the roofing iron and all the walls for the wall battens which the cladding will be screwed to. As well as calculating the number of fasteners for the deck – 3200 to my count. The view sitting on the roof is fantastic although I think Callum was too nervous to enjoy his position on the ladder. I hope my post night duty maths and measuring is accurate but we will find out when the Trim deck gets here at the end of the week.

The house from every side and the middle.

IMG_0339 IMG_0340 IMG_0341 IMG_0342 IMG_0343 IMG_0344 IMG_0345

Cheers

Franky

 

This entry was posted in House. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s