23 JAN 2012

Hi All,

Well today Angus and I started putting flashings, insulation and battens on in preparation for the corrugated iron cladding. It was windy as always which made it a bit tricky handling the long sheets of Aircell insulation. We managed to get most of the west side of the living area done. The east side will be done on Tuesday, hopefully the wind will be in the same direction and blow the insulation onto the wall instead of off.

From the inside

IMG_0440

The outside

IMG_0435

I hope Nathan is happy with the flashings. The one between the windows took some modifications (needed to be cut in half) to fit.

IMG_0438

Cheers

Franky

This entry was posted in House and tagged , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s